Right on the water in Pascagoula: a FORTIFIED replacement in three weeks

An aging roof south of the interstate, a homeowner travelling for most of the job, and a two-day install she approved the morning after the estimate.

Front elevation of the brick Pascagoula home and its fountain under the completed FORTIFIED Pewter Gray shingle roofThe aging shingle roof of the Pascagoula home from the ridge at the June 25 inspection, the front yard and fountain belowBeforeAfter
Location
Pascagoula, MS
System
Architectural shingle — GAF Timberline HDZ, Pewter Gray
Standard
FORTIFIED Roof — certified
Roof size
64 squares · about 6,400 sq ft
On site
3 days, start to finish
Timeline
Inspected June 25 · approved June 26 · installed July 14–15.

The situation

Nothing had failed yet. The roof had a couple of weak spots, but what prompted the call was age, and the neighbors: houses around her were getting new roofs, and she knew hers was due.

She is in Pascagoula, about forty-five minutes east of our Gulfport office, and right off the water. On this coast the landmark for storm exposure is Interstate 10 — south of it is where the wind and rain land first — and she is well south of it.

The old shingle roof over the carport of the Pascagoula home seen from the main roof at the June 25 inspection
Before: nothing had failed yet, but the roof was due and the neighbors were replacing theirs.

What we did

We inspected on June 25 and sent the estimate the same day. She approved it the next morning.

Because of where the house sits, we recommended the FORTIFIED Roof standard. From the street the roof is the same shingle her neighbors have; the difference is under it. If a storm takes shingles off, the house stays dry until we can get there.

  • Full tear-off, deck inspected and repaired.
  • Self-adhering ice-and-water membrane across the entire deck, instead of synthetic felt.
  • Sealed starter course at eaves and rakes; drip edge fastened every four inches.
  • Power ventilation replaced.
  • Every product and every install step photographed with location data, as the FORTIFIED evaluator requires.

She was travelling for most of the job. We sent updates as the work moved — where the crew was, how much was left, what we had found in the deck — so there were no surprises when she got home.

Tarps draped over the front of the Pascagoula home catching old shingles during the tear-off
Tear-off day one, the house and beds under tarps.
The bare roof deck of the Pascagoula home inspected and ready, rolls of ice-and-water membrane staged on it
Deck inspected, membrane staged for the whole roof — not just the valleys.
A tape measure along the new drip edge on the Pascagoula roof documenting the four-inch fastener spacing
Drip edge fastened every four inches, measured and photographed for the evaluator.

The result

Materials were checked on July 13, the crew started on the 14th, and the roof was finished on the 15th. Nineteen days from first inspection to a completed, certified FORTIFIED roof.

One scuff on the stucco at the front was patched before we closed the job out. She told us the communication was what she appreciated most.

Looking down the new Pewter Gray shingle roof of the Pascagoula home toward the carport on the afternoon it was finished
July 15, late afternoon — the new field, finished.
The brick Pascagoula home and its carport under the completed FORTIFIED Pewter Gray shingle roof
Side and carport, finished.
The new hips and ridge of the Pascagoula roof looking toward the street on completion day
New hips and ridge, looking toward the street.
Rear of the brick Pascagoula home and its screened porch under the new Pewter Gray shingle roof a month on
The rear, a month on.

Your roof could be the next one

A free inspection, an honest repair-or-replace answer, and — if we do the work — a roof we would put our name under.