Service AreasCall now (228) 231-1630
A roofing project manager in a hard hat, safety glasses and high-visibility vest measures the eave of a brick Gulfport home from the ground with a tape measure, clipboard in hand, for a written estimate

Roof replacement · Mississippi Gulf Coast

How Much Does a New Roof Cost on the Mississippi Gulf Coast?

Statewide, This Old House puts the average Mississippi roof replacement at $7,763, with most jobs between $6,164 and $18,621. On the coast, roof size, pitch, deck condition and the system you choose move that number, which is why we price your actual roof from a walk and photographs rather than a range.

Get a free written estimate(228) 231-1630

Statewide averages are a floor, not a quote

Published averages mix in small, simple roofs a long way from the beach. They are a useful floor and a bad quote. Below is what actually moves the price on this coast, and how to compare estimates line by line so two quotes are describing the same roof.

How roofers measure a roof

Roofers price by the “square,” which is 100 square feet of roof surface. A single-story 1,800 square foot home usually carries 20 to 26 squares, depending on pitch and overhangs. Applied to a roof that size, This Old House’s Mississippi averages of $4.70 per square foot for asphalt shingle and $8.71 for metal come out like this:

Statewide averages from This Old House
Typical single-story homeArchitectural shingleStanding seam metal
20 squares (2,000 sq ft of roof)about $9,400about $17,400
26 squares (2,600 sq ft of roof)about $12,200about $22,600

Source: This Old House, The Cost of a Roof Replacement in Mississippi, updated November 12, 2026. Per-square-foot averages multiplied by 20 and 26 squares and rounded to the nearest $100.

Read this carefully. Those are statewide averages from This Old House applied to a typical roof, not Gulf South Roofing prices. Steep pitch, a second story, rotten decking, or a FORTIFIED upgrade can put a coast roof well above them. The only number that applies to your house is the written estimate, and that one is free.

What drives the price on the coast

  • Size and pitch. More squares means more material and labor. Steep roofs and second stories slow the crew down and need more safety rigging.
  • Tear-off. We remove every layer down to the deck on every job and never roof over an old roof. Each extra layer adds labor and disposal.
  • Deck repair. Soft or rotten sheathing has to be replaced before anything goes on top. In This Old House’s 2026 survey, about one homeowner in four said hidden damage was a major factor in their final cost. A good estimate prices deck repair per sheet up front, so it is never a surprise.
  • Material. Shingle lines vary in wind rating and warranty. Metal costs more, and standing seam costs more than exposed-fastener panels. See architectural shingle and metal roofing.
  • Flashing and details. Chimneys, walls, valleys and skylights take time. We bend our own flashing in our Gulfport sheet metal shop, so a custom piece takes days instead of weeks, and it fits.
  • Ventilation. Balanced intake and ridge ventilation protects the deck and the shingle warranty. Sometimes that means adding vents the old roof never had.
  • FORTIFIED. A sealed deck, ring-shank nails and locked-down edges add cost. They also earn a wind-premium discount every year you own the home. See FORTIFIED roofing.
  • Permit and disposal. Your city or county sets the permit fee. It belongs on the estimate as its own line, along with dumpster and cleanup.
New OSB sheathing at the eave of a Gulf Coast roof during a replacement, the rotten section cut out and replaced before the underlayment goes down
Deck repair is the one cost nobody can see until the old roof is off, which is why it should be priced per sheet before the job starts.

How to read a roofing estimate

Two quotes can be thousands apart because they are not quoting the same roof. Check that each one spells out:

  • Full tear-off to the deck, with the number of layers
  • Deck repair priced per sheet
  • Underlayment type, and whether the deck is sealed
  • New drip edge and flashing, not reused
  • Ventilation: what is added and what is removed
  • The exact shingle or panel product and color
  • Nailing pattern: six nails per shingle, or ring-shank if FORTIFIED
  • Permit, disposal and cleanup
  • Workmanship warranty length, in writing
  • Manufacturer warranty registration
  • A Mississippi license number. Residential roofing over $10,000 requires a license from the State Board of Contractors.

Ways to lower the cost without cutting corners

  • Replace before it leaks. Waiting turns a roof job into a roof, deck, insulation and drywall job. Our guide to the signs a roof is near the end shows what to look for.
  • Ask about the wind discount. A FORTIFIED roof can earn a wind-premium discount for as long as you own the home, which offsets part of the upgrade over time.
  • Use insurance only for real storm damage. Sudden wind or hail damage may be covered. Age and wear are not. See storm damage vs. wear and tear.
  • Finance instead of using a credit card. Financing is available on replacements, subject to credit approval. See financing.
  • Ask about repair first. If the roof has years left, we will say so. See roof repair.

What you get from Gulf South Roofing

A project manager walks the roof, photographs what we find, and shows you the pictures before recommending anything. You get a written estimate priced with and without the FORTIFIED upgrade, with deck repair listed per sheet, and a 3, 5 or 10 year workmanship warranty in writing. Read how it went for homeowners in our case studies.

Aerial view of a completed architectural shingle roof replacement by Gulf South Roofing on a home in Diamondhead, Mississippi
A finished architectural shingle replacement in Diamondhead, MS.

Price your roof, not an average

The estimate is free, written and itemized, and it comes with the photographs we took on your roof. Call (228) 231-1630 or send the form and we will call you back the same business day.

Request a free written estimate

Tell us about the roof. A project manager will call to set a time to walk it.

Free, no obligation. Prefer to talk now? Call (228) 231-1630.

Frequently asked questions

How long does a roof replacement take?

Most homes take one to four days on site, depending on size, pitch and how much decking needs replacing. Our recent case studies ran from one day on a straightforward Long Beach roof to four on a Gulfport home with dormers. Weather can push the start date.

Does homeowners insurance pay for a new roof?

Only when sudden damage like wind or hail is covered by your policy. Insurance does not pay for age or wear. Our storm damage guide explains how to tell the two apart.

Is metal worth the extra cost on the coast?

It often lasts longer and handles wind well, but it costs more up front. A 50-year system that costs more than a 20-year system is not more expensive per year, and it may go through zero replacements while the shingle roof goes through two.

Why do roofing quotes vary so much?

Usually scope. One quote includes deck repair, sealed underlayment and new flashing; another assumes the best case and adds costs later. Compare them line by line using the checklist on this page.

Do you charge for an estimate?

No. Inspections and written estimates are free, with no obligation. A project manager walks the roof, photographs it, and shows you the photos before recommending anything.

Can I finance a new roof?

Financing is available on replacements, subject to credit approval. Ask when you request your estimate, or see the financing page.

Reviewed by the Gulf South Roofing team · Last updated November 21, 2026 · Statewide figures from This Old House, The Cost of a Roof Replacement in Mississippi, updated November 12, 2026.

Get the number for your roof

A free, written, itemized estimate from a project manager who walked your roof and photographed it. No range, no guess, no obligation.

Gulf South Roofing · 2811 26th Avenue, Gulfport, MS 39501
(228) 231-1630 · info@gulfsouthroofing.net
CallFree estimate